Water
Rising Main Installation on the Thames Water Network
600m
OD350 PE100 rising main
6
Chambers & manholes
Zero
Utility strikes

VEA Water
VEA Water delivers clean water, wastewater and drainage infrastructure for regulated UK water networks. Our capability covers trunk and distribution mains, sewers and rising mains, trenchless rehabilitation, specialist PE jointing, chambers, pumping stations and full testing and commissioning, delivered with a zero utility-strike approach to excavation.

VEA Water supports water networks through planned maintenance, responsive repairs and specialist infrastructure works. Our teams work across the lifecycle of water assets, from maintenance and repair through to metering, chambers, connections and associated civil engineering. The existing capability includes both planned and emergency water-main work, bulk metering, PRVs and specialist repairs.

Capability In Focus
Repair, maintenance and development works delivered around live networks, customer supply and regulatory requirements — from mains and connections through to metering, chambers and reinstatement.
UK
Wide coverage
24/7
Response
Full
Reinstatement
Capability
Pre-Construction Surveys & Site Investigations
We carry out surveys and investigations to provide information for design and construction planning. This includes ground penetrating radar (GPR) scanning, trial holes and ground investigations to help identify existing underground services and assess ground conditions. The findings support decisions on excavation, pipeline routes and construction methods.
Network Surveys & Condition Assessments
We carry out CCTV sewer surveys and condition assessments to help identify defects and establish the condition of existing drainage and sewer networks. Survey findings can inform the planning of maintenance, repairs and rehabilitation works.
Safe Excavation
We do not rely solely on utility drawings or conventional locating equipment. Known services are exposed using vacuum excavation. Where records suggest services are present but their exact position cannot be confirmed, we use vacuum excavation to investigate and prove the area, typically to a depth of at least one metre, before conventional excavation begins.
The result: zero utility strikes and zero safety incidents on our water utility works to date.

Where We Work
We deliver across the whole of the United Kingdom. Our delivery model allows us to mobilise for suitable projects nationwide, wherever our clients need us.
How We Deliver
Survey & Plan
Site assessment, permits and method statements agreed before mobilisation.
Mobilise
Accredited crews, plant and traffic management deployed to programme.
Deliver
Works completed around live supply, with quality and safety controlled throughout.
Reinstate & Verify
Full reinstatement, testing and handover documentation provided.
On Site





Featured Case Study

For MGroup Water, LOT 4 developer activities
600m
OD350 PE rising main
Zero
Utility strikes
2 weeks → 4 days
Programme reduction
Case Studies

Water
600m
OD350 PE100 rising main
6
Chambers & manholes
Zero
Utility strikes