VEA Water

VEA Water

Water Infrastructure. Maintenance. Response.

VEA Water delivers clean water, wastewater and drainage infrastructure for regulated UK water networks. Our capability covers trunk and distribution mains, sewers and rising mains, trenchless rehabilitation, specialist PE jointing, chambers, pumping stations and full testing and commissioning, delivered with a zero utility-strike approach to excavation.

VEA Water

Supporting Critical Water Infrastructure

VEA Water supports water networks through planned maintenance, responsive repairs and specialist infrastructure works. Our teams work across the lifecycle of water assets, from maintenance and repair through to metering, chambers, connections and associated civil engineering. The existing capability includes both planned and emergency water-main work, bulk metering, PRVs and specialist repairs.

Built For Live Water Networks

Capability In Focus

Built For Live Water Networks

Repair, maintenance and development works delivered around live networks, customer supply and regulatory requirements — from mains and connections through to metering, chambers and reinstatement.

UK

Wide coverage

24/7

Response

Full

Reinstatement

Capability

What We Can Do

Pre-Construction Surveys & Site Investigations

We carry out surveys and investigations to provide information for design and construction planning. This includes ground penetrating radar (GPR) scanning, trial holes and ground investigations to help identify existing underground services and assess ground conditions. The findings support decisions on excavation, pipeline routes and construction methods.

Network Surveys & Condition Assessments

We carry out CCTV sewer surveys and condition assessments to help identify defects and establish the condition of existing drainage and sewer networks. Survey findings can inform the planning of maintenance, repairs and rehabilitation works.

Safe Excavation

Safe Excavation. Zero Utility Strikes.

We do not rely solely on utility drawings or conventional locating equipment. Known services are exposed using vacuum excavation. Where records suggest services are present but their exact position cannot be confirmed, we use vacuum excavation to investigate and prove the area, typically to a depth of at least one metre, before conventional excavation begins.

The result: zero utility strikes and zero safety incidents on our water utility works to date.

Vacuum excavation used to expose services on site

Where We Work

Where We Work

We deliver across the whole of the United Kingdom. Our delivery model allows us to mobilise for suitable projects nationwide, wherever our clients need us.

How We Deliver

A Controlled Delivery Sequence

01

Survey & Plan

Site assessment, permits and method statements agreed before mobilisation.

02

Mobilise

Accredited crews, plant and traffic management deployed to programme.

03

Deliver

Works completed around live supply, with quality and safety controlled throughout.

04

Reinstate & Verify

Full reinstatement, testing and handover documentation provided.

On Site

VEA Water In Delivery

Vacuum excavation proving the excavation on a live carriageway
Vacuum excavation proving the excavation on a live carriageway
New chamber openings constructed and connected in a residential street
New chamber openings constructed and connected in a residential street
Pre-cast chamber with gate valve and ladder access installed in the excavation
Pre-cast chamber with gate valve and ladder access installed in the excavation
Flanged main and valve arrangement connected into a new chamber
Flanged main and valve arrangement connected into a new chamber
Trench shoring installed with excavator support on a residential street
Trench shoring installed with excavator support on a residential street

Featured Case Study

Chamber works on the Thames Water network

Rising Main Installation on the Thames Water Network

For MGroup Water, LOT 4 developer activities

600m

OD350 PE rising main

Zero

Utility strikes

2 weeks → 4 days

Programme reduction

Read the Case Study

Case Studies

Project Experience

Rising Main Installation on the Thames Water Network

Water

Rising Main Installation on the Thames Water Network

600m

OD350 PE100 rising main

6

Chambers & manholes

Zero

Utility strikes

Read case study